A Category 6 permanent link fails the NEXT test at high frequencies. Which corrective action is MOST likely to resolve this?
-
A
Replace the cable with a larger diameter conductor
-
B
Re-terminate the connectors to reduce untwisting at the termination point
-
C
Increase the pull tension to remove slack from the cable run
-
D
Add a grounding conductor between the patch panel and the jack