During a post-deployment validation survey, a wireless engineer measures RSSI of -75 dBm at the cell edge. What is the MOST appropriate next step to confirm adequate coverage?
-
A
Document and close the survey since -75 dBm meets minimum thresholds
-
B
Cross-reference RSSI with SNR and throughput measurements at the same location
-
C
Increase AP transmit power across the entire network immediately
-
D
Move the AP to a location closer to the measured cell edge