What is the purpose of a mud rotary conductor casing installed before main drilling begins?
-
A
To serve as the production casing for the finished well
-
B
To prevent surface soils from caving into the borehole during drilling
-
C
To house the submersible pump permanently
-
D
To provide a conduit for electrical cables