AV Signal Flow and Distribution Flashcards
6 cards from real CTS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 AV Signal Flow and Distribution flashcards as text
What does 'HDCP' stand for and why is it relevant to AV signal distribution?
Answer: High-bandwidth Digital Content Protection — controls copying of protected content
HDCP is a copy-protection scheme applied to HDMI and DisplayPort signals that requires all devices in the signal chain to be HDCP-compliant for protected content to pass.
In an AV system, what is the role of a matrix switcher?
Answer: Routes any input to any output or combination of outputs simultaneously
A matrix switcher allows any input source to be routed to any output destination independently and simultaneously, providing maximum flexibility in large AV systems.
What is 'signal latency' and why does it matter in live AV presentations?
Answer: The delay between when a signal is sent and when it is received or displayed
Latency is the processing delay in a signal chain; excessive latency causes audible lip-sync issues between video and audio, which is critical to manage in live presentations.
Which signal format carries both audio and video over a single cable in modern AV installations?
Answer: HDMI
HDMI carries high-definition video and multi-channel audio over a single cable, simplifying connections in modern AV system designs.
What is the purpose of an AV 'extender' in a signal distribution system?
Answer: Extends the transmission distance of a signal beyond the normal cable length limit
AV extenders use technologies like HDBaseT or fiber optic to transmit signals well beyond the native distance limits of HDMI or other formats.
When planning AV signal flow, what is the first step a CTS professional should take?
Answer: Create a signal flow diagram showing sources, processing, and destinations
Drawing a signal flow diagram first ensures all sources, processing equipment, switchers, and destinations are accounted for before equipment selection or installation begins.