In CTQP structures inspection, a 'critical finding' requires the inspector to:
-
A
Document and include it in the next scheduled report
-
B
Notify the responsible authority immediately and restrict or close the bridge if warranted
-
C
Flag it for the next in-depth inspection cycle
-
D
Consult a materials laboratory before any action