CTO Approach & Departure Sequencing 2 — Questions and Answers
Question 1: When sequencing aircraft on final approach, what minimum wake turbulence separation is required between a heavy aircraft followed by a small aircraft?
- 3 nautical miles
- 4 nautical miles
- 5 nautical miles
- 6 nautical miles (Correct answer)
Correct answer: 6 nautical miles
A small aircraft following a heavy requires 6 nautical miles of radar separation to account for wake turbulence.
Question 2: An aircraft on a 5-mile final requests a go-around. What is the tower controller's FIRST action?
- Notify approach control
- Issue missed approach instructions (Correct answer)
- Sequence the aircraft back into the traffic flow
- Advise other aircraft of the go-around
Correct answer: Issue missed approach instructions
The controller must immediately issue missed approach instructions to ensure the aircraft climbs safely before coordinating further.
Question 3: What term describes the practice of issuing takeoff clearance while another aircraft is still on the runway but past the intersection in use?
- Conditional clearance
- Land and hold short
- Intersection departure
- Anticipated separation (Correct answer)
Correct answer: Anticipated separation
Anticipated separation allows a departure clearance when the controller judges that required separation will exist when the departing aircraft reaches the runway.
Question 4: During simultaneous parallel runway operations, what is the minimum distance between centerlines of parallel runways for independent IFR approaches without specific authorization?
- 2,500 feet
- 3,000 feet
- 4,300 feet (Correct answer)
- 5,000 feet
Correct answer: 4,300 feet
Independent parallel IFR approaches require at least 4,300 feet between runway centerlines without special authorization.
Question 5: A pilot reports 'unable' when issued a speed restriction on final approach. What should the tower controller do?
- Cancel the approach clearance
- Coordinate alternate spacing with approach control (Correct answer)
- Issue a go-around immediately
- Reduce the restriction to a lower speed
Correct answer: Coordinate alternate spacing with approach control
When a pilot cannot comply with a speed restriction, the controller must coordinate with approach control to re-sequence or adjust spacing.
Question 6: What is the purpose of issuing a 'number one, cleared to land' callout to a sequenced aircraft?
- It assigns the aircraft a specific landing sequence position
- It confirms the aircraft is first for landing and cleared for the runway (Correct answer)
- It cancels any previous speed restrictions issued
- It authorizes the aircraft to deviate from the published approach
Correct answer: It confirms the aircraft is first for landing and cleared for the runway
Stating 'number one' confirms the aircraft's sequence position and the clearance authorizes landing on the specified runway.
Question 7: Which departure sequence technique involves assigning specific departure times to control flow into a congested en route sector?
- Miles-in-trail restriction
- Expect departure clearance time (EDCT) (Correct answer)
- Departure fix posting
- Flow control advisory
Correct answer: Expect departure clearance time (EDCT)
An EDCT is assigned by the Traffic Management Unit to meter departures and reduce congestion downstream.
When sequencing aircraft on final approach, what minimum wake turbulence separation is required between a heavy aircraft followed by a small aircraft?