When applying epoxy grout on a hot day with substrate temperatures above 90°F, the installer should expect:
-
A
Longer working time due to heat thinning the resin
-
B
Significantly shortened working time requiring smaller batch sizes
-
C
No change in working time since epoxy is temperature-independent
-
D
Better adhesion due to improved resin flow