An integrator is configuring a redundant PLC system. Which mechanism ensures automatic failover to the standby CPU without losing the current process state?
-
A
Periodic program backup to a USB stick
-
B
Hot standby with continuous state synchronization between primary and secondary CPUs
-
C
Cold standby where the secondary restarts from last saved program
-
D
Manual switchover initiated by the operator at the HMI