Under Irish Construction Regulations 2013, what must be prepared before construction work begins on a project with more than one contractor?
-
A
Only a building permit
-
B
A Safety and Health Plan prepared by the Project Supervisor for the Construction Stage (PSCS)
-
C
A fire evacuation plan only
-
D
No documentation is required