Fire Safety Flashcards

6 cards from real CSCS practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 Fire Safety flashcards as text
  1. What is the minimum width of an escape route on a construction site?

    Answer: At least 1 metre, and wider if more than 50 persons use it

    HSE guidance and BS 9999 recommend escape routes be at least 1 metre wide. The width should increase based on the number of people who may need to use it, and routes must be kept clear of obstructions at all times.

  2. What colour is a foam fire extinguisher?

    Answer: Red with a cream/beige label

    Under BS EN 3, all fire extinguishers in the UK have a red body. Foam extinguishers are identified by a cream or beige coloured label/band. This colour coding helps users quickly identify the correct extinguisher type.

  3. What is the purpose of a fire assembly point?

    Answer: A predetermined safe location where workers gather after evacuation so a headcount can be taken

    The fire assembly point is a safe location, upwind and away from the building, where all personnel gather after evacuation. It allows a headcount to confirm everyone has evacuated and identifies anyone who may be trapped.

  4. What is a fire watch and when is it required?

    Answer: A period of monitoring after hot work to detect and extinguish any smouldering materials

    A fire watch is a period of continuous monitoring (typically at least 60 minutes) after hot work is completed. A designated person checks for smouldering materials, hot spots, or any signs of fire developing in the work area.

  5. Under UK regulations, how often should fire drills be carried out on a construction site?

    Answer: At regular intervals, typically every 6 months or when there are significant changes to the site layout

    Fire drills should be carried out at regular intervals to ensure all workers know the evacuation procedure. On construction sites where layouts change frequently, drills may need to be more frequent than in fixed premises.

  6. What is the main cause of fires on UK construction sites?

    Answer: Hot work (welding, cutting, grinding) and arson

    HSE data indicates that hot work (welding, cutting, grinding) and arson are the leading causes of fires on UK construction sites. This is why hot work permits and site security are critical fire prevention measures.