Risk Management & Maintenance Flashcards

7 cards from real CRE practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Risk Management & Maintenance flashcards as text
  1. Which maintenance strategy is BEST suited for components where failure consequences are safety-critical and failure modes are detectable before function loss?

    Answer: Condition-based maintenance

    Condition-based maintenance monitors detectable degradation signals to intervene before safety-critical failures occur.

  2. In a risk matrix, a hazard rated 'Catastrophic' severity with 'Improbable' likelihood is typically classified as:

    Answer: ALARP region risk

    Catastrophic severity with low probability typically falls in the ALARP (As Low As Reasonably Practicable) region requiring justification to accept.

  3. The P-F interval in predictive maintenance refers to the time between:

    Answer: Potential failure detection and functional failure

    The P-F interval is the time from when a potential failure becomes detectable to when functional failure occurs.

  4. Which risk reduction technique involves adding redundant systems to reduce the probability of overall system failure?

    Answer: Fault tolerance

    Fault tolerance uses redundancy so that individual component failures do not cause system-level failure.

  5. A Bow-Tie diagram in risk management combines which two analysis techniques?

    Answer: Fault Tree Analysis and Event Tree Analysis

    A Bow-Tie diagram uses a Fault Tree on the left (causes leading to a hazard) and an Event Tree on the right (consequences).

  6. When applying RCM (Reliability-Centered Maintenance), the first question to ask about each function is:

    Answer: What is the item's function?

    RCM always begins by defining what functions the asset is required to perform in its operating context.

  7. Which maintenance tactic is most appropriate for a component with an Infant Mortality failure pattern (high early failure rate)?

    Answer: Burn-in testing before installation

    Burn-in or run-in testing screens out early failures before installation, reducing field failures from infant mortality.