← All CRE Flashcard Decks

Documentation and Reporting Flashcards

7 cards from real CRE practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Documentation and Reporting flashcards as text
  1. A CRE is preparing a Reliability Program Plan (RPP). Which MIL standard provides the template structure most commonly referenced for defense programs?

    Answer: MIL-STD-785

    MIL-STD-785 (Reliability Program for Systems and Equipment Development and Production) defines the tasks and documentation structure for a defense reliability program plan.

  2. In a Fault Tree Analysis (FTA) report, the 'minimum cut sets' section is important because it documents what?

    Answer: The smallest combinations of basic events whose simultaneous occurrence causes the top event

    Minimum cut sets identify the smallest independent failure combinations that can cause the top-level system failure, directly guiding design and maintenance priorities.

  3. Which document type is used to formally request a change to a contractually baselined reliability requirement?

    Answer: Engineering Change Proposal (ECP)

    An Engineering Change Proposal (ECP) is the formal mechanism for proposing changes to baselined program requirements, including reliability requirements under configuration control.

  4. A Life Cycle Cost (LCC) analysis report attributes a significant portion of total cost to reliability. Which cost category typically dominates in high-availability systems?

    Answer: Operations and support (O&S) costs driven by maintenance and spares

    For high-availability systems, operations and support costs — including corrective maintenance, preventive maintenance, and spare parts — typically dominate the total life cycle cost.

  5. What does a 'confidence interval' of 90% lower one-sided bound on MTBF of 500 hours mean in a test report?

    Answer: We are 90% confident the true MTBF is at least 500 hours

    A one-sided lower 90% confidence bound of 500 hours means there is 90% statistical confidence that the true population MTBF is equal to or greater than 500 hours.

  6. During a program design review, the reliability engineer presents a 'reliability allocation' document. What does this document accomplish?

    Answer: It distributes the overall system reliability requirement down to subsystem and component levels

    Reliability allocation cascades the top-level system reliability requirement down to lower-level subsystems so each design team has a quantitative reliability target to design toward.

  7. Which action is required when a FRACAS report identifies a 'systemic' failure versus an 'isolated' failure?

    Answer: Initiate a fleet-wide review and corrective action affecting all units, documented with broader scope

    A systemic failure indicates a design or process deficiency affecting all units, requiring a documented fleet-wide corrective action rather than a unit-level repair.

Documentation and Reporting Flashcards — CRE Study Cards with Answers