Which type of control chart is MOST appropriate for monitoring the proportion of defective items in subgroups of varying size?
Answer: p-chart
The p-chart monitors the proportion (fraction) defective and accommodates varying subgroup sizes, unlike the np-chart which requires constant size.
In Failure Mode and Effects Analysis (FMEA), the Risk Priority Number (RPN) is calculated as:
Answer: Severity × Occurrence × Detection
RPN = Severity × Occurrence × Detection, and is used to prioritize which failure modes require corrective action.
A Type I error in hypothesis testing means:
Answer: Rejecting the null hypothesis when it is actually true (false positive)
A Type I error (alpha error) occurs when the null hypothesis is rejected even though it is true — a false positive conclusion.
Which quality tool is MOST appropriate for analyzing whether a relationship exists between two continuous variables?
Answer: Scatter diagram
A scatter diagram plots pairs of data to visually assess the correlation (relationship) between two continuous variables.
The primary difference between Quality Assurance (QA) and Quality Control (QC) is that:
Answer: QA is process-focused and preventive; QC is product-focused and detection-based
QA focuses on processes and preventing defects from occurring, while QC focuses on inspecting products to detect defects.
Under ISO 9001:2015, which element is explicitly required to be documented as retained evidence of conformity?
Answer: Records of monitoring and measurement results
ISO 9001:2015 requires retaining documented information (records) as evidence that monitoring and measurement results conform to requirements.
A gage R&R study reveals that measurement system variation accounts for 35% of total observed variation. This result indicates:
Answer: The measurement system may need improvement before making process decisions
AIAG guidelines classify a gage R&R above 30% as unacceptable, requiring corrective action before the gage is used for process decisions.