  1. A quality engineer discovers that outgoing product has been shipped with a known defect without customer notification. The most appropriate first action is to:

    Answer: Notify the customer and initiate a containment response

    Immediate customer notification and containment are ethical and contractual obligations when defective product has already shipped.

  2. The acceptance quality limit (AQL) in an acceptance sampling plan defines:

    Answer: The worst quality level still considered acceptable as a process average

    AQL is the maximum percent nonconforming (or defects per hundred units) that is still considered a satisfactory process average for sampling purposes.

  3. Which lean concept focuses on producing only what the next process step needs, only when needed?

    Answer: Just-in-Time (JIT) production

    Just-in-Time production eliminates overproduction waste by synchronizing output to downstream demand signals such as kanban cards.

  4. When calibrating a measurement instrument, traceability means the calibration results are:

    Answer: Linked to national or international measurement standards through an unbroken chain

    Metrological traceability requires an unbroken chain of calibrations connecting the instrument to a recognized national measurement institute such as NIST.

  5. A process producing 3.4 defects per million opportunities (DPMO) operates at approximately which sigma level?

    Answer: 6 sigma

    Six Sigma is defined as a process capability producing no more than 3.4 DPMO, assuming a 1.5-sigma long-term shift in the mean.

  6. The primary difference between verification and validation in product development is:

    Answer: Verification confirms the product was built correctly; validation confirms the right product was built

    Verification asks 'Did we build it right?' (compliance to design specifications); validation asks 'Did we build the right thing?' (fitness for intended use).

  7. Which tool is best suited for systematically identifying potential failures in a new product design before production begins?

    Answer: Design FMEA