CPWM Regulatory Compliance & Risk Management 3 — Questions and Answers
Question 1: Under the Safe Drinking Water Act, which rule establishes maximum contaminant levels (MCLs) for disinfection byproducts in public water systems?
- Lead and Copper Rule
- Stage 2 Disinfectants and Disinfection Byproducts Rule (DBP2) (Correct answer)
- Surface Water Treatment Rule
- Groundwater Rule
Correct answer: Stage 2 Disinfectants and Disinfection Byproducts Rule (DBP2)
The Stage 2 DBP Rule sets locational running annual average MCLs for total trihalomethanes and haloacetic acids in distribution systems.
Question 2: A contractor working on a federally funded public works project must comply with prevailing wage requirements under which federal law?
- Service Contract Act
- Davis-Bacon Act (Correct answer)
- Fair Labor Standards Act
- Walsh-Healey Public Contracts Act
Correct answer: Davis-Bacon Act
The Davis-Bacon Act requires payment of locally prevailing wages and fringe benefits to workers on federally funded construction projects over $2,000.
Question 3: Which OSHA standard requires employers to develop a written plan for entering confined spaces such as manholes and underground vaults?
- 29 CFR 1926.502 – Fall Protection
- 29 CFR 1910.146 – Permit-Required Confined Spaces (Correct answer)
- 29 CFR 1910.147 – Lockout/Tagout
- 29 CFR 1926.651 – Excavations
Correct answer: 29 CFR 1910.146 – Permit-Required Confined Spaces
29 CFR 1910.146 requires employers to develop and implement a written permit-required confined space program when workers must enter spaces with hazardous atmospheres or engulfment potential.
Question 4: In the context of public works risk management, what does a Corrective Action Plan (CAP) primarily address?
- Future project planning and budgeting
- Identified deficiencies or regulatory violations requiring remediation (Correct answer)
- Annual performance evaluation for staff
- Emergency evacuation procedures
Correct answer: Identified deficiencies or regulatory violations requiring remediation
A Corrective Action Plan outlines specific steps, timelines, and responsible parties to remedy identified deficiencies, audit findings, or regulatory noncompliance.
Question 5: Which federal agency oversees the Underground Injection Control (UIC) program that protects underground sources of drinking water?
- FEMA
- EPA (Correct answer)
- USACE
- USDOT
Correct answer: EPA
The EPA administers the Underground Injection Control program under the Safe Drinking Water Act to prevent contamination of underground drinking water sources.
Question 6: A public works manager must ensure that infrastructure projects near wetlands obtain which federal permit before construction begins?
- Section 401 Water Quality Certification only
- Section 404 Permit from the Army Corps of Engineers (Correct answer)
- Section 402 NPDES Permit only
- EPA Superfund Authorization
Correct answer: Section 404 Permit from the Army Corps of Engineers
Section 404 of the Clean Water Act requires a permit from the U.S. Army Corps of Engineers for discharge of dredged or fill material into waters of the U.S., including wetlands.
Question 7: Which element is NOT typically included in a public agency's emergency operations plan (EOP)?
- Incident command structure
- Resource management procedures
- Annual employee salary schedules (Correct answer)
- Continuity of operations provisions
Correct answer: Annual employee salary schedules
Emergency operations plans address incident command, resource management, and continuity of operations but do not include routine administrative items like salary schedules.
Under the Safe Drinking Water Act, which rule establishes maximum contaminant levels (MCLs) for disinfection byproducts in public water systems?