  1. What does a control chart's 'upper control limit' (UCL) represent?

    Answer: Three standard deviations above the process mean

    The UCL is set at three standard deviations above the process mean, indicating the boundary beyond which variation is considered non-random.

  2. Which sampling method selects every nth item from a production run?

    Answer: Systematic sampling

    Systematic sampling selects every nth item at fixed intervals throughout the production run.

  3. What is the purpose of a fishbone (Ishikawa) diagram in quality management?

    Answer: Identify root causes of a problem

    A fishbone diagram visually maps potential causes of a problem, organized by categories like machine, method, material, and manpower.

  4. A gauge with a resolution of 0.001 inch is used to measure a part tolerance of ±0.005 inch. This gauge resolution is considered:

    Answer: Adequate for the measurement

    A gauge resolution of 0.001 inch can distinguish increments much smaller than the ±0.005 inch tolerance, making it adequate.

  5. Which quality cost category includes the cost of inspecting incoming raw materials?

    Answer: Appraisal costs

    Incoming inspection is an appraisal activity — it evaluates product or process quality before further processing.

  6. On a p-chart, what does 'p' stand for?

    Answer: Proportion of defective units in a sample

    A p-chart monitors the proportion (fraction) of defective items in successive samples of varying or fixed size.

  7. What action should a technician take when a measurement falls exactly on the upper control limit of a control chart?

    Answer: Treat it as in-control but monitor closely

    A single point on the control limit is technically still in-control, but the technician should watch for additional signals suggesting a process shift.