A CPSI inspects a playground and finds the protective surfacing has displaced significantly under swings and at slide exits. What is the most appropriate immediate action?
-
A
Document the finding and schedule repair within 30 days
-
B
Close the affected equipment immediately until surfacing is restored to adequate depth
-
C
Post a warning sign and continue inspection
-
D
Notify the manufacturer for warranty replacement