A pool operator notices that chlorine residuals vary widely throughout the day despite consistent dosing. What is the FIRST step in a structured process improvement approach?
-
A
Immediately increase the chlorine feed rate
-
B
Document current conditions and identify the root cause of variability
-
C
Replace all chemical feed equipment
-
D
Close the pool until residuals stabilize