Under OSHA 29 CFR 1910.147, which step must be done immediately after applying locks and tags and before starting work on a machine?
-
A
Notify the plant manager in writing
-
B
Verify isolation by attempting to operate the equipment
-
C
Remove the machine guards
-
D
Bleed the hydraulic reservoir to empty