A quality engineer calculates that a process has a Cpk of 0.85. What does this indicate?
-
A
The process is centered and capable of meeting specifications
-
B
The process is not capable and is producing some defects outside specification
-
C
The process has too little variation relative to the specification width
-
D
Cpk cannot be used without knowing the Cp value first