Operations Execution & Continuous Improvement Flashcards
7 cards from real CPIM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Operations Execution & Continuous Improvement flashcards as text
A quality engineer calculates that a process has a Cpk of 0.85. What does this indicate?
Answer: The process is not capable and is producing some defects outside specification
A Cpk below 1.0 indicates the process does not reliably meet specifications and is producing out-of-spec output.
In lean manufacturing, poka-yoke devices are designed primarily to:
Answer: Prevent errors from occurring or make errors immediately detectable
Poka-yoke (mistake-proofing) devices are designed to prevent errors at the source or make them instantly visible.
A CPIM candidate reviews a value stream map. Which symbol typically represents a push arrow between processes on a VSM?
Answer: A straight push arrow (→) indicating batch transfer without a pull signal
On a VSM, a straight push arrow between processes indicates that material is pushed regardless of downstream demand.
A manufacturer reduces batch sizes from 500 to 50 units. The MOST likely impact on lead time is:
Answer: Lead time decreases because work-in-process inventory levels fall
Smaller batches reduce WIP queues and wait time between operations, significantly cutting total lead time.
An operations team is using the Plan-Do-Check-Act (PDCA) cycle. In which phase would they pilot a solution on a small scale before full implementation?
Answer: Do
The 'Do' phase involves executing the planned change, typically as a small-scale pilot or trial.
Which of the following is a key difference between a push and a pull production system?
Answer: Push systems produce to a forecast; pull systems produce in response to actual demand
Push systems schedule production based on forecasts, while pull systems authorize production only when downstream demand signals are received.
A supervisor uses the '5 Whys' technique after a machine breakdown. The PRIMARY goal of this technique is to:
Answer: Identify the root cause of a problem by repeatedly asking why
The 5 Whys iteratively drills past symptoms to uncover the root cause of a problem, enabling permanent corrective action.