During a post-storm inspection, which condition would require IMMEDIATE corrective action before the next rainfall event?
-
A
Minor sediment accumulation on paved surfaces
-
B
A silt fence with more than 50% of its height filled with sediment
-
C
Temporary seeding that has not yet germinated after 3 days
-
D
A construction entrance with slightly loosened rock