A contractor proposes using a plastic sheeting (polyethylene) cover over a stockpile during a storm. What is a key limitation of this approach?
-
A
Plastic sheeting degrades too quickly to provide adequate protection
-
B
Concentrated runoff from the sheeting edges can cause erosion at the stockpile perimeter
-
C
Plastic sheeting is not approved under any state construction general permit
-
D
The sheeting prevents natural vegetation from establishing on the stockpile