(CPE) Certified Plant Engineer Practice Test

CPE Electrical Systems & Controls 3

Free · Instant Results

A plant has a measured power factor of 0.72 lagging at 480V, 3-phase, drawing 800 kW. How much reactive power (kVAR) must be added to correct the power factor to 0.95 lagging?
▶ Start Practice Test