CPC Project Quality Management 1 — Questions and Answers
Question 1: What is the primary purpose of a quality management plan in a project?
- To document how quality will be defined, measured, and controlled throughout the project (Correct answer)
- To assign blame when deliverables fail inspection
- To replace the project scope statement
- To track team attendance
Correct answer: To document how quality will be defined, measured, and controlled throughout the project
A quality management plan outlines standards, roles, and processes to ensure deliverables meet requirements.
Question 2: Which quality concept focuses on preventing defects rather than inspecting for them after the fact?
- Quality assurance (Correct answer)
- Quality control
- Gold plating
- Benchmarking
Correct answer: Quality assurance
Quality assurance is a proactive process designed to prevent defects by improving project processes.
Question 3: A project coordinator reviews completed deliverables against acceptance criteria before presenting them to the client. This is an example of:
- Quality control (Correct answer)
- Quality assurance
- Scope creep
- Risk monitoring
Correct answer: Quality control
Quality control involves inspecting specific deliverables to verify they meet defined standards.
Question 4: The 80/20 rule applied to quality states that:
- 80% of defects come from 20% of causes (Correct answer)
- 80% of the budget covers 20% of features
- 80% of team effort produces 20% of results
- 20% of clients cause 80% of scope changes
Correct answer: 80% of defects come from 20% of causes
Pareto analysis (80/20 rule) helps teams prioritize the vital few causes responsible for most defects.
Question 5: Which tool displays the frequency of defect categories in descending order to identify the most significant issues?
- Pareto chart (Correct answer)
- Scatter diagram
- Control chart
- Fishbone diagram
Correct answer: Pareto chart
A Pareto chart ranks defect types by frequency, making the most impactful problems visually obvious.
Question 6: "Gold plating" in project management refers to:
- Adding features beyond what the client requested without approval (Correct answer)
- Exceeding quality standards on a critical deliverable
- Applying expensive materials to meet requirements
- Documenting every quality check performed
Correct answer: Adding features beyond what the client requested without approval
Gold plating means adding unrequested extras, which wastes resources and may not align with stakeholder needs.
What is the primary purpose of a quality management plan in a project?