_______ is the name for the foundation, which consists of a thick slab of reinforced cement covering the entire region to support highly concentrated structural loads.

Correct! Wrong!

The wedge-shaped bricks used to create the arch ring are known as

Correct! Wrong!

Only after ______ may the form work, including the supports, be removed from the beams.

Correct! Wrong!

The depth of exploration for each floor (or storey) of a building should be _______.

Correct! Wrong!

_______ refers to the posture of a brick when it is lay on its side in a 9 cm by 9 cm square with its frog in the vertical plane.

Correct! Wrong!

_______ is a type of mortar that uses both cement and lime as binding agents.

Correct! Wrong!

For isolated foundations on clayey soils, the overall settlement should not exceed _______.

Correct! Wrong!

A water-logged soil's ability to support weight can be increased by:

Correct! Wrong!

Choose the appropriate statement from the list below:

Correct! Wrong!

The minimal depth of foundations, according to Rankine's formula, is ______.

Correct! Wrong!

_______ is made from marble chips that range in size from 4 to 6 mm.