Construction Test 1
Choose one of the following to represent the false statement:
Correct!
Wrong!
When drilling in ________, rotary drilling is the fastest method.
Correct!
Wrong!
The depth of soil exploration for large embankments and dams should not be less than _______.
Correct!
Wrong!
For spans, couple roof is used.
Correct!
Wrong!
If the soil is _______, a pile foundation is typically offered.
Correct!
Wrong!
A cross joint is _______ to the plumb line when it is aligned.
Correct!
Wrong!
The soil's bearing capacity cannot be increased by
Correct!
Wrong!
_______ is a protruding element that is typically used to support a truss.
Correct!
Wrong!
Only after ____ days may the formwork on the underside of the slabs be removed.
Correct!
Wrong!
________ are the best kind of piles for soft soil with little resistance to the flow of concrete.
Correct!
Wrong!
For beams and slabs, concrete slump should range from ________.
Correct!
Wrong!