Manufacturing Information Systems & ERP Flashcards

7 cards from real CMS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Manufacturing Information Systems & ERP flashcards as text
  1. What does MRP stand for in the context of manufacturing planning systems?

    Answer: Material Requirements Planning

    MRP stands for Material Requirements Planning, a system that calculates material needs based on the Master Production Schedule and Bill of Materials.

  2. Which of the following is NOT a required input for an MRP system?

    Answer: Customer satisfaction survey data

    MRP requires three core inputs — MPS, BOM, and inventory records — customer satisfaction surveys are not part of material requirements planning.

  3. What is a Bill of Materials (BOM) in a manufacturing information system?

    Answer: A hierarchical listing of all components and subassemblies required to build a finished product

    A Bill of Materials is a structured, hierarchical listing of every raw material, component, and subassembly needed to manufacture a finished product.

  4. How did MRP II (Manufacturing Resource Planning) expand upon the original MRP I system?

    Answer: By incorporating financial planning and capacity planning alongside material requirements

    MRP II extended MRP I by integrating financial planning, capacity planning, and other business resources beyond just material requirements calculation.

  5. What is the primary function of an Enterprise Resource Planning (ERP) system in manufacturing?

    Answer: To integrate all core business processes across the organization into a unified information system

    ERP integrates all core business processes — finance, HR, supply chain, manufacturing, and more — into a single unified information platform.

  6. In an MRP system, 'lead time' is defined as:

    Answer: The time required to procure or manufacture a component before it is needed in production

    Lead time in MRP is the procurement or manufacturing time needed for a component, used to offset planned order releases so materials arrive when required.

  7. In MRP, what does 'time-phased requirements' mean?

    Answer: Requirements are calculated and scheduled by specific time periods aligned with when materials are actually needed

    Time-phased MRP calculates and schedules material needs within specific time buckets, ensuring materials are ordered and received precisely when production requires them.