  1. What does MRO stand for in spare parts management?

    Answer: Maintenance, Repair, and Operations

    MRO stands for Maintenance, Repair, and Operations, referring to consumable materials and supplies needed for operations.

  2. What is the purpose of ABC classification in spare parts inventory?

    Answer: To categorize parts by value and usage to apply different control strategies

    ABC classification uses the Pareto principle to categorize items by annual usage value.

  3. What is the Economic Order Quantity (EOQ) formula used to determine?

    Answer: The optimal order quantity minimizing total ordering and carrying costs

    EOQ calculates the order quantity that balances ordering costs against holding costs.

  4. What is the purpose of a critical spares analysis?

    Answer: To determine which spares must be stocked to avoid unacceptable risks from equipment failure

    Critical spares analysis identifies parts that must be available to prevent unacceptable consequences from equipment failure.

  5. What is the reorder point in inventory management?

    Answer: The inventory level at which a new order should be placed

    The reorder point triggers a purchase order, set to cover expected demand during lead time plus safety stock.

  6. What is vendor-managed inventory (VMI) in MRO?

    Answer: An arrangement where the supplier monitors and replenishes inventory at your facility