CMP CMP Risk Management & Mitigation 1 — Questions and Answers
Question 1: Which risk assessment framework categorizes capture risks by probability and impact on a two-axis grid?
- Risk matrix (heat map) (Correct answer)
- SWOT analysis
- Gantt chart
- Earned value management
Correct answer: Risk matrix (heat map)
A risk matrix plots probability against impact to help teams prioritize which capture risks require the most urgent mitigation.
Question 2: What is the primary purpose of a risk register in a capture plan?
- Document identified risks and mitigation strategies (Correct answer)
- Track competitor pricing
- Schedule proposal milestones
- List team member responsibilities
Correct answer: Document identified risks and mitigation strategies
A risk register records each identified risk along with its owner, likelihood, impact, and mitigation plan in one central document.
Question 3: Which risk response strategy involves shifting the financial or operational burden of a risk to a third party through subcontracting or insurance?
- Risk avoidance
- Risk transfer (Correct answer)
- Risk acceptance
- Risk reduction
Correct answer: Risk transfer
Risk transfer moves the exposure to a party better positioned to manage it, such as subcontracting a high-risk technical component to a specialist.
Question 4: In capture planning, a 'Black Swan' event is best described as:
- A highly improbable, high-impact event that is difficult to predict (Correct answer)
- A guaranteed contract loss to a competitor
- A government-mandated bid requirement
- A routine risk identified in every proposal
Correct answer: A highly improbable, high-impact event that is difficult to predict
Black Swan events are rare, unpredictable occurrences with significant consequences that fall outside normal risk expectations.
Question 5: What does 'risk appetite' define in the context of capture management?
- The level of risk an organization is willing to accept in pursuing a contract (Correct answer)
- The total budget allocated to risk mitigation activities
- The number of risks identified during a gate review
- The minimum probability threshold for formally reporting a risk
Correct answer: The level of risk an organization is willing to accept in pursuing a contract
Risk appetite guides bid/no-bid decisions by defining how much uncertainty the organization is prepared to tolerate when pursuing an opportunity.
Question 6: Which ongoing capture management practice involves continuously monitoring risk indicators throughout the entire pursuit lifecycle?
- Risk surveillance (Correct answer)
- Black-hat review
- Storyboarding
- Price-to-win analysis
Correct answer: Risk surveillance
Risk surveillance ensures emerging threats are detected and addressed before they derail the capture effort, rather than being assessed only at the start.
Which risk assessment framework categorizes capture risks by probability and impact on a two-axis grid?