When performing a zero-point calibration on a load cell, which condition must be met before proceeding?
-
A
The cell must be at operating temperature with no load applied
-
B
The cell must be loaded to 50% capacity
-
C
The cell must be cooled to ambient temperature
-
D
The cell must be connected to an external reference standard