What is the purpose of a 'hydrologic reclamation plan' required under SMCRA permit applications?
-
A
To project future water demand for mine dewatering pumps
-
B
To demonstrate how mining and reclamation will minimize disturbance to the hydrologic balance
-
C
To map all surface water features within 500 feet of the permit area
-
D
To calculate the volume of stormwater retention ponds needed during operations