← All CLC Flashcard Decks

Project Budgeting & Specification Flashcards

7 cards from real CLC practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Project Budgeting & Specification flashcards as text
  1. When writing a lighting specification, which document section defines the acceptable manufacturer substitutions?

    Answer: Or-Equal Clause

    The Or-Equal Clause outlines the conditions under which a different manufacturer's product may be substituted while meeting spec intent.

  2. A luminaire has a listed price of $480 and the project receives a 35% contractor discount. What is the net unit cost?

    Answer: $312.00

    $480 × (1 − 0.35) = $480 × 0.65 = $312.00 net unit cost.

  3. Which lighting specification format uses open, performance-based language to encourage competitive bidding?

    Answer: Descriptive specification

    A descriptive specification defines performance criteria and characteristics without naming a specific manufacturer, enabling competitive bidding.

  4. A project's lighting budget is $120,000. If fixture costs represent 60% and controls represent 15%, how much remains for labor and miscellaneous?

    Answer: $30,000

    60% + 15% = 75% allocated, leaving 25% × $120,000 = $30,000 for labor and miscellaneous.

  5. In CSI MasterFormat, Division 26 covers which trade?

    Answer: Electrical

    Division 26 in CSI MasterFormat covers Electrical systems, including lighting fixtures and controls.

  6. What is the purpose of an allowance in a lighting project budget?

    Answer: To reserve funds for items not yet fully defined at bid time

    An allowance sets aside a fixed dollar amount for scope items that cannot be fully specified at bid time, such as owner-furnished fixtures.

  7. Which submittal type requires the specifier to verify that a proposed product meets all specification requirements before approval?

    Answer: Substitution request

    A substitution request requires detailed comparison showing the proposed alternate meets or exceeds every specification requirement.