What must be done with a scaffold inspection report under the Work at Height Regulations 2005?
-
A
It must be kept on site and available for inspection for 3 months
-
B
It can be disposed of after the scaffold is dismantled
-
C
It only needs to be completed if defects are found
-
D
It must be sent to the HSE within 24 hours