Under the Control of Asbestos Regulations 2012, what must a manager do before any demolition or refurbishment work begins on a building?
-
A
Assume the building is asbestos-free if built after 1990
-
B
Carry out a refurbishment and demolition asbestos survey (R&D survey)
-
C
Only check for asbestos in the roof
-
D
Start work and stop if asbestos is found