What is a method statement (safe work method statement) used for on a construction site?
Answer: Describing how a specific high-risk task will be performed safely
A method statement details the step-by-step process for completing a high-risk task safely, including controls for each hazard.
Who is legally responsible for ensuring a construction site complies with OSHA standards?
Answer: The employer (general contractor and subcontractors)
Under OSHA, employers — including the general contractor and each subcontractor — are legally responsible for worker safety compliance.
What is the maximum weight a worker should manually lift without mechanical assistance under general ergonomic guidelines?
Answer: 50 lbs
NIOSH and general ergonomic guidelines recommend 50 lbs as the threshold beyond which mechanical lifting aids should be used.
What is the purpose of a permit-to-work (PTW) system on a construction site?
Answer: To formally control hazardous non-routine tasks with management sign-off
A PTW system ensures hazardous tasks (hot work, confined space entry, electrical isolation) are planned, authorized, and monitored.
What does the acronym CPM stand for in construction scheduling?
Answer: Critical Path Method
The Critical Path Method (CPM) is a scheduling technique that identifies the sequence of tasks determining the shortest project duration.
What should a site manager do immediately after a serious injury occurs on site?
Answer: Secure the scene, call emergency services, and notify management and OSHA if required
After a serious injury, the manager must call emergency services, preserve the scene, and report to OSHA within required timeframes.