Building Regulations and Standards Flashcards

7 cards from real CITB practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Building Regulations and Standards flashcards as text
  1. Which document provides guidance on staircase design, including riser and going dimensions, under Building Regulations?

    Answer: Approved Document K

    Approved Document K (Protection from Falling, Collision and Impact) includes guidance on stair design, including maximum riser heights and minimum going dimensions.

  2. What is the maximum pitch allowed for a staircase in a new dwelling under Approved Document K?

    Answer: 42°

    Approved Document K limits the pitch of a private stair in a dwelling to a maximum of 42°.

  3. Under Building Regulations, which of the following requires a mandatory Overheating Assessment for new residential buildings?

    Answer: Approved Document O

    Approved Document O (Overheating) requires new residential buildings to demonstrate mitigation against overheating through modelling or the simplified method.

  4. What is the Building Regulations requirement for a smoke alarm in a new single-storey dwelling?

    Answer: Mains-wired interlinked alarms on each storey

    Building Regulations require mains-wired, interlinked smoke alarms on each storey of a new dwelling, conforming to Approved Document B.

  5. Which of the following is exempt from requiring Building Regulations approval?

    Answer: A detached garden shed under 15m² with no sleeping accommodation

    A detached outbuilding such as a shed under 15m² with no sleeping accommodation is exempt from Building Regulations approval.

  6. Under Approved Document L, what is a 'Dwelling Emission Rate' (DER) used to measure?

    Answer: The actual CO₂ emissions of a new dwelling compared to a target rate

    The Dwelling Emission Rate (DER) measures the actual CO₂ emissions of a new dwelling and must not exceed the Target Emission Rate (TER) set by Approved Document L.

  7. Who has the authority to issue a Regularisation Certificate for building work that was carried out without Building Regulations approval?

    Answer: The local authority building control

    Only the local authority building control can issue a Regularisation Certificate for unauthorized building work, as Approved Inspectors cannot retrospectively certify work.