← All CIT Flashcard Decks

System Installation and Layout Flashcards

6 cards from real CIT practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 System Installation and Layout flashcards as text
  1. A technician is installing a PVC mainline in a trench. To ensure a strong, watertight seal when joining a pipe and fitting using solvent cement, what is the critical first step after cutting and deburring the pipe?

    Answer: Apply a full, even coat of primer to the outside of the pipe end and the inside of the fitting socket.

    Applying primer is a crucial step that softens the surfaces of the PVC pipe and fitting, allowing the solvent cement to create a chemical weld. Skipping this step or applying it incorrectly can result in a weak bond and potential leaks.

  2. When laying out sprinkler heads for a turf zone, what is the industry best practice for ensuring uniform water distribution and avoiding dry spots?

    Answer: Arranging sprinklers to achieve head-to-head coverage.

    Head-to-head coverage, where the spray from one sprinkler head reaches the adjacent sprinkler head, is the industry standard for achieving the most uniform water distribution across an irrigation zone. This overlap compensates for variations in spray patterns and wind, preventing dry spots between heads.

  3. A residential irrigation system plan specifies a Pressure Vacuum Breaker (PVB) for backflow prevention. Which of the following is a mandatory installation requirement for this device?

    Answer: It must be installed at least 12 inches above the highest outlet in the irrigation system.

    Pressure Vacuum Breakers (PVBs) are designed to prevent back-siphonage and must be installed at a minimum elevation of 12 inches above the highest sprinkler head or outlet they serve. This elevation is critical for the air inlet valve to function correctly and protect the potable water supply.

  4. During a commercial installation, what is the generally accepted minimum trench depth for PVC lateral lines to protect them from routine landscape maintenance activities and light traffic?

    Answer: 12 inches

    For commercial installations, a minimum depth of 12 inches to the top of the lateral pipe is a common industry standard. This depth provides adequate protection from aeration equipment, shovels, and other potential surface damage.

  5. After solvent welding several PVC joints on a hot, dry day (approx. 90°F), a technician is anxious to test the mainline for leaks. According to most solvent cement manufacturers' guidelines for pipes 1¼" or smaller under 160 psi, what is the minimum cure time before the system can be safely pressurized?

    Answer: 15 minutes

    Cure time is the period required for a solvent-welded joint to gain full strength. While set time (when the joint can be handled) is very short, pressurizing the system too early can cause joint failure. For smaller pipes in warm conditions, a minimum cure time of 15 minutes is often specified for pressures up to 160 psi, though longer times are needed for higher pressures, larger pipes, or colder temperatures.

  6. Which of the following is the most critical step to perform immediately BEFORE backfilling an excavated trench containing newly installed irrigation pipes?

    Answer: Flush the system of debris and perform a pressure test.

    It is essential to flush the pipes to remove any dirt or debris that entered during installation and then conduct a pressure test to check for leaks while the joints are still visible. Repairing a leak is significantly easier before the trench is backfilled. Backfilling without testing risks burying a problem that will require re-excavation.