โ† All CIT Flashcard Decks

Safety, Tools, and Documentation Flashcards

6 cards from real CIT practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 Safety, Tools, and Documentation flashcards as text
  1. A technician is tasked with installing a new irrigation system at a residential property. What is the legally required first step that must be taken several days before any trenching or digging begins?

    Answer: Contact the local one-call utility notification center.

    Before any excavation, it is a legal requirement in most jurisdictions to contact the one-call utility notification center (e.g., by dialing 811). This service notifies member utility companies to mark the approximate location of their underground lines, preventing potentially dangerous and costly damage to gas, electric, water, and communication lines.

  2. When operating a walk-behind trencher, which piece of Personal Protective Equipment (PPE) is most critical for protecting against flying debris and rocks?

    Answer: Safety glasses with side shields

    Trenchers can kick up rocks, soil, and other debris at high velocity. Safety glasses with side shields provide essential protection against projectiles that could cause serious eye injury. While other PPE like boots, gloves, and hearing protection are also important for overall safety, eye protection directly addresses the primary hazard of flying debris.

  3. After completing an irrigation system installation that required several on-site modifications from the original plan, the lead technician is required to create an "as-built" drawing. What is the primary purpose of this document?

    Answer: To provide an accurate record of the final location of all system components for future maintenance and repairs.

    An as-built drawing is a revised version of the original design plan that reflects any changes made during the construction process. Its primary purpose is to provide the property owner and future service technicians with an accurate map of where all components (pipes, valves, wires, heads) are actually located, which is invaluable for troubleshooting, repairs, and future modifications.

  4. On an irrigation design plan, a symbol shows a simple circle with a single dot in the center, connected to a lateral line. What does this symbol most commonly represent?

    Answer: A pop-up sprinkler head

    While symbols can vary and a legend should always be consulted, a circle with a dot in the middle is a widely recognized and common symbol for a sprinkler head on an irrigation blueprint. Valves, backflow devices, and other components have their own distinct, different symbols.

  5. According to OSHA (Occupational Safety and Health Administration) standards, at what minimum depth must a trench be protected from caving in by using a protective system such as shoring, sloping, or a trench box?

    Answer: 5 feet (1.5 meters)

    OSHA standard 29 CFR 1926.652(a)(1) requires that a protective system be used in excavations that are 5 feet deep or deeper, unless the excavation is made entirely in stable rock. This is a critical safety rule to prevent trench collapse, which is a leading cause of fatalities in excavation work.

  6. A technician needs to connect a 1-inch polyethylene (poly) pipe to a spiral barb fitting and secure it with a stainless steel clamp. Which of the following tools is specifically designed to properly tighten the clamp for a secure, leak-free connection?

    Answer: A pair of pinch clamp crimpers

    Polyethylene pipe is joined to barb fittings using mechanical clamps, not solvent cement. Pinch clamp crimpers (or pincers) are specifically designed to tighten a stainless steel pinch or ear clamp around the pipe and fitting, creating a durable and watertight seal that resists pulling apart under pressure.