A client wants to water their lawn at 6:00 AM but the system has 4 zones that cannot run simultaneously due to insufficient water supply. The controller should be programmed to:
-
A
Run all zones at 6:00 AM on the same program
-
B
Stack zones sequentially on the same program with a 6:00 AM start time
-
C
Create 4 separate programs with staggered start times
-
D
Use cycle and soak on all zones simultaneously