Which GIPS (Global Investment Performance Standards) requirement ensures that composite construction fairly represents a firm's track record?
Answer: All fee-paying discretionary portfolios must be included in at least one composite
GIPS requires that all fee-paying discretionary portfolios be assigned to at least one composite to prevent cherry-picking of favorable performance records.
When comparing two portfolios with different levels of risk, which performance measure puts them on an equal-risk footing by adjusting both to the market's risk level?
Answer: M-squared (M²)
M-squared adjusts each portfolio's return to match the benchmark's total risk level, allowing direct comparison on a common risk basis.
Which of the following risk measures is specifically designed to quantify the sensitivity of a bond's price to changes in yield?
Answer: Modified duration
Modified duration measures the percentage change in a bond's price for a 1% change in yield, making it the primary measure of interest rate sensitivity.
Which of the following best describes the Sortino ratio compared to the Sharpe ratio?
Answer: Sortino penalizes only downside volatility, not upside volatility
The Sortino ratio replaces standard deviation with downside deviation, so only returns below the target (usually risk-free rate) are penalized.
In a factor-based performance attribution, a manager's portfolio has a higher value-factor loading than the benchmark. If value underperforms during the period, this will contribute a:
Answer: Negative active return
Overweighting a factor (value) that underperforms relative to the benchmark will generate a negative contribution to active return during that period.
Which statement correctly differentiates absolute risk from relative risk in portfolio management?
Answer: Absolute risk measures total portfolio volatility; relative risk measures deviation from a benchmark
Absolute risk (e.g., standard deviation, VaR) measures the portfolio's total volatility, while relative risk (e.g., tracking error) measures deviation from a specific benchmark.
Which of the following is a primary use of drawdown analysis in portfolio risk management?
Answer: Measuring the peak-to-trough decline to assess worst-case loss experience
Maximum drawdown measures the largest peak-to-trough decline in portfolio value, helping investors understand the worst historical loss experience.