CIM Disaster Recovery & Business Continuity 2 — Questions and Answers
Question 1: What is the primary purpose of a Business Impact Analysis (BIA) in a business continuity program?
- To identify and prioritize critical business functions and quantify the impact of their disruption (Correct answer)
- To create a detailed technical recovery procedure for IT systems
- To assign blame for past incidents and prevent recurrence
- To calculate the total cost of insurance premiums needed
Correct answer: To identify and prioritize critical business functions and quantify the impact of their disruption
A BIA identifies critical business functions, estimates financial and operational impacts of disruption, and informs recovery priority and resource allocation.
Question 2: Which term describes the maximum tolerable length of time that a business process can be offline before causing unacceptable harm?
- Recovery Point Objective (RPO)
- Maximum Tolerable Downtime (MTD) (Correct answer)
- Mean Time to Repair (MTTR)
- Service Level Agreement (SLA)
Correct answer: Maximum Tolerable Downtime (MTD)
MTD (also called Maximum Tolerable Period of Disruption) defines the absolute outer limit of acceptable downtime for a business process.
Question 3: During a tabletop exercise, participants discover their DR plan references a vendor hotline that no longer exists. What should be the immediate corrective action?
- Declare the exercise a failure and reschedule
- Update the plan with current vendor contact information and reassign ownership for keeping it current (Correct answer)
- Proceed with the exercise without correction since it is only a drill
- Escalate to senior management for disciplinary action
Correct answer: Update the plan with current vendor contact information and reassign ownership for keeping it current
Tabletop exercises are designed to surface exactly these gaps; the correct response is to document and remediate the discrepancy and assign ongoing ownership.
Question 4: A company replicates data to a secondary site every four hours. If a disaster occurs, what is the worst-case data loss scenario?
- Zero data loss because replication is active
- Up to four hours of data (Correct answer)
- Up to eight hours of data
- Loss depends solely on the RTO, not replication frequency
Correct answer: Up to four hours of data
The Recovery Point Objective is determined by the replication interval; with four-hour cycles, up to four hours of transactions could be lost.
Question 5: Which recovery site type offers the fastest time-to-operational but also carries the highest ongoing cost?
- Cold site
- Warm site
- Hot site (Correct answer)
- Mobile recovery unit
Correct answer: Hot site
A hot site is a fully equipped, staffed, and continuously synchronized duplicate facility that can assume operations within minutes but incurs significant recurring costs.
Question 6: In the context of disaster recovery, what does 'failback' mean?
- Switching operations to the secondary site during a disaster
- Returning operations to the primary site after it has been restored (Correct answer)
- Backing up data immediately after a failover event
- Testing the secondary site under production load conditions
Correct answer: Returning operations to the primary site after it has been restored
Failback is the planned process of transitioning workloads from the recovery/secondary site back to the restored primary environment.
Question 7: Which document formally authorizes activation of the Business Continuity Plan and identifies who has that authority?
- Incident Action Plan
- Crisis Communications Plan
- BCP Activation Authority Matrix (Correct answer)
- Risk Register
Correct answer: BCP Activation Authority Matrix
The Activation Authority Matrix (or equivalent document) specifies the conditions under which the BCP is triggered and which roles hold the authority to invoke it.