  1. A known error differs from a problem in that a known error:

    Answer: Has a documented root cause and a known workaround or fix

    A known error is a problem for which the root cause has been identified and a workaround or permanent resolution has been documented.

  2. Which of the following best describes the '5 Whys' technique's main limitation?

    Answer: It can lead to a single linear causal chain, missing multiple contributing factors

    The 5 Whys can oversimplify complex problems by following one causal path, potentially missing parallel or systemic contributing factors.

  3. What role does the Known Error Database (KEDB) play in incident management?

    Answer: It provides the service desk with documented workarounds to resolve incidents faster

    The KEDB allows the service desk to quickly apply documented workarounds from previous problem investigations, reducing incident resolution time.

  4. When prioritizing problems, which two factors are most commonly used?

    Answer: Impact and urgency

    Problem priority is typically determined by combining impact (scope of business effect) and urgency (speed at which resolution is needed).

  5. An organization experiences a major outage caused by a misconfigured firewall. Which RCA method would best model the logical conditions that led to the failure?

    Answer: Fault Tree Analysis

    Fault Tree Analysis models logical relationships between events using boolean gates, making it well-suited for analyzing technical failure chains like misconfigured infrastructure.

  6. What is the purpose of a workaround in the context of problem management?

    Answer: To temporarily reduce or eliminate the impact of an incident while the problem remains open

    A workaround provides a temporary means of restoring service or reducing impact without permanently resolving the underlying root cause.

  7. Which of the following scenarios triggers the need for a major problem review?

    Answer: A high-impact incident that revealed significant gaps in the organization's processes or controls

    Major problem reviews are conducted when significant incidents expose systemic weaknesses, aiming to prevent recurrence and improve organizational resilience.