During a post-installation inspection, you discover that several fence posts are out of plumb by more than 2 degrees. What is the most appropriate corrective action?
-
A
Backfill with additional concrete and leave as-is
-
B
Reset the posts to meet plumb tolerance before final acceptance
-
C
Apply tension wire to pull posts into alignment
-
D
Document the deviation and obtain owner sign-off