CFC Site Preparation & Layout Flashcards
6 cards from real CFC practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 CFC Site Preparation & Layout flashcards as text
Which soil type generally requires the deepest post embedment due to low bearing capacity?
Answer: Loose sandy or fill soil
Sandy and loose soils provide minimal lateral resistance, requiring greater embedment depth and often concrete backfill to keep posts stable under load.
When installing a fence on a hillside using the stepped method, the individual fence sections must be:
Answer: Level (horizontal) with vertical drops between adjacent sections
In the stepped method, each section is installed level and the height difference between sections creates a stair-step appearance at the posts.
Frost depth is a critical factor when determining post embedment depth because:
Answer: Posts set above the frost line can be pushed upward by freeze-thaw cycles
When soil freezes and expands below a shallow post, frost heave pushes the post upward; embedment below the local frost line prevents this movement.
When planning a fence gate rough opening, the measurement must account for:
Answer: Gate width plus clearance for hinges, latch hardware, and swing arc
The rough opening must accommodate the gate leaf width plus hinge gap, latch-side clearance, and any swing arc obstruction to ensure smooth, unobstructed operation.
After setting all posts, the contractor should verify correct installation by checking:
Answer: Vertical plumb with a level and horizontal alignment with a string line
A plumb bob or level confirms each post is vertical, while a taut string line confirms all posts are in the same plane horizontally before panels are installed.
When excavating post holes with a power auger near a marked utility line, the contractor should:
Answer: Hand-dig a tolerance zone of at least 18–24 inches on each side of the marked utility
Utility markings are approximate; federal guidelines require hand-digging within 18–24 inches on either side of any marked utility to safely expose and protect it.