A construction site inspector finds silt fence buried under 18 inches of sediment. What is the CORRECT action?
-
A
Replace the fence with a higher fence
-
B
Remove accumulated sediment and restore fence height
-
C
Add a second row of silt fence downslope
-
D
Flag the area and allow natural consolidation