What is the purpose of a stabilized construction entrance/exit (also called a rock pad or wheel wash) under pollution prevention requirements?
-
A
To create a permeable surface that allows stormwater to infiltrate before leaving the site
-
B
To reduce the tracking of mud and sediment onto public roads by construction vehicles
-
C
To serve as a secondary containment area for fuel and chemical storage
-
D
To provide a designated area for concrete truck washout operations