During an inspection of a linear utility project, which unique challenge does the inspector face compared to a traditional land development site?
-
A
Linear projects never require SWPPPs
-
B
The disturbed corridor is long and narrow, making it difficult to establish perimeter controls and stabilize slopes quickly
-
C
Utility projects are exempt from NPDES stormwater requirements
-
D
Linear projects only disturb impervious surfaces