What is the purpose of a tracking control BMP such as a stabilized construction entrance?
-
A
Reduce sediment tracked onto public roads by construction vehicles
-
B
Filter stormwater runoff leaving the site perimeter
-
C
Slow runoff velocity on internal access roads
-
D
Prevent unauthorized vehicle access to the site