7 cards from real Certified Six Sigma Black Belt Exam practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Assessment flashcards as text
  1. A Black Belt conducts a process risk assessment using FMEA. Which combination of RPN factors is used to prioritize failure modes?

    Answer: Severity, Occurrence, Detection

    RPN (Risk Priority Number) = Severity × Occurrence × Detection, with scores on a 1–10 scale for each factor.

  2. A measurement system assessment shows a discrimination ratio (DR) of 3. What does this indicate?

    Answer: The gauge is inadequate; DR must be at least 5

    A discrimination ratio below 5 indicates the gauge cannot adequately distinguish between parts; a DR ≥ 5 is the minimum acceptable threshold.

  3. Which assessment technique involves tracking a single unit or batch through an entire process to identify all value-added and non-value-added steps?

    Answer: Value stream mapping

    Value stream mapping documents every step, delay, and resource for a product or service family, categorizing each step as value-added or waste.

  4. A Six Sigma team is assessing whether a new process has a different mean than the historical mean of 50 units. The sample size is 30 and population variance is unknown. Which test is appropriate?

    Answer: One-sample t-test

    With unknown population variance and n=30, a one-sample t-test is used to compare a sample mean against a known historical value.

  5. During a process assessment, rolled throughput yield (RTY) is calculated across 4 sub-processes with yields of 95%, 92%, 97%, and 90%. What is the RTY?

    Answer: 76.4%

    RTY = 0.95 × 0.92 × 0.97 × 0.90 ≈ 0.764, or approximately 76.4%.

  6. A Black Belt wants to assess whether defect rates differ significantly across three production shifts. Which statistical test is most appropriate?

    Answer: Chi-square test for independence

    A chi-square test for independence compares categorical defect counts across groups (shifts), making it appropriate for this assessment.

  7. In capability assessment, what does a Cpm index measure that Cpk does not?

    Answer: Process centering relative to the target value

    Cpm (Taguchi capability index) penalizes deviation from the nominal target, not just the specification limits, making it target-centric.